To minimise the Heath and Safety risks during high pressure hydro tests being able to calculate an estimated air content is a necessary requirement before proceeding with a Factory Acceptance Hydro test.
The following is one simple method of estimating the air content of a pipe or vessel. In some applications calculating air content before hydro is prerequisite before proceeding with a full hydro test.